d7b14692bde4ec630ba4b034d8dd5372

Project information

Disciplines

Building structures

Place

Hoofddorp

Client

Huber Car Park Systems International Germany

Architect

n/a

Project size

13.500m2 GFA

Start of project

2012

Completion

2013

Consulting services

Structural design, detailed design drawings, structural calculations
chevron-right chevron-left

The parking garage is constructed by means of a steel skeleton, steel composite decking and two prefabricated concrete cores in which the staircases and an elevator are located. The structure is founded on a concrete foundation with prefabricated concrete piles. The garage is split level and contains 430 parking spots.