Start construction S Building Radboudumc Nijmegen

On December 14, 2018 the construction of the S Building started. S Building is the last building in the renewal plan of the Radboudumc.

At this moment the contractor FourCare is making more than 12 meters deep walls in the ground, which after excavation will function as a temporary and permanent ground barrier. After the completion of the excavation the foundation rafts for the tower cranes will be made, after which they can be built up.

Aronsohn Constructions provides the complete structural design, specifications and detail drawings, as well as the structural calculations and cost estimates.

Triodosbank2

Timelapse New office Triodos Bank in Zeist

The new office building of Triodos Bank will be located at Landgoed De Reehorst and will be a fully sustainable office and optimally integrated into the environment. The entire estate is being developed according to the vision that nature, culture and economy are in balance with each other.

Aronsohn Constructies provides the complete structural design, specifications and detailed drawings and calculations for the construction of the new office of Triodos Bank.

 

20181205_090523

First box girders arrives at Oosterdokseiland

The work on the Oosterdokseiland is in full swing.

The first parts of the welded box girders of 2.50 m wide and 2.50 m high have arrived at work.

For the Oosterdokseiland project, Aronsohn Constructies has designed the constructions, detailing and construction calculation.

HollandPTC-opening

HollandPTC officially opened

 

On Friday 30 November, the official opening of HollandPTC took place in the Prinsenhof museum in Delft. Recently patients are being treated with proton therapy, a new form of radiotherapy against cancer for the Netherlands, in the outpatient centre HollandPTC located on the campus of the TU Delft.

Parallel to these treatments, TU Delft is working together in HollandPTC with the LUMC and Erasmus MC medical centres on innovations in the care of cancer patients. Treatment, education and research go hand in hand to achieve better and responsible care.

Aronsohn Constructies provided the complete structural design, specifications and detail drawings as well as the constructive calculations. The building was designed by De Jong Gortemaker Algra Architects.

IMG_0753

Hoisting trusses OCC The Hague

 

On October 26th the work for hoisting the large steel trusses above the Theater of the OCC building in The Hague has started. The heaviest frame weighs 110,000 kg and with a span of over 30 meters it is the largest element in the entire OCC building. To be able to hoist this truss, the temporary deployment of a special crane is necessary, which is built up on the Spuiplein.

Aronsohn provides the complete structural design for the OCC, as well as the specifications and detail drawings and the detailed calculations.

Foto hoogste punt 28-9-2018

Highest point Naturalis Leiden

The new building for Naturalis Biodiversity Center has reached its highest point. J.P. van Eesteren, celebrated this traditional moment with Naturalis, Aronsohn and all others involved at the construction site in Leiden on 28 September 2018. Edwin van Huis, director of Naturalis, marked the highest point by placing one of the last elements of the striking, forty meter high glass crown gable.

Aronsohn provides the complete structural design, as well as the specifications and detail drawings and calculations.

Webcam foto

Wooden core for sustainable office Triodos Bank

When building the new office of Triodos Bank Nederland and Triodos Investment Management in Driebergen, sustainability is the key. Recently, J.P. van Eesteren started with the installation of a core made entirely out of wood. Read the full article here. (Source: J.P. van Eesteren)

Aronsohn Constructies provides the complete structural design, specifications, detailed drawings and calculations for the construction of the new office of Triodos Bank.

Houten kern

Triodosbank2

Erasmus-MC-ziekenhuis-Rotterdam-luchtfoto

Official opening new Erasmus MC

On 6 September 2018 the Erasmus Medical Centre in Rotterdam officially opened its doors and His Majesty King Willem-Alexander performed the opening ceremony.

The opening took place after twenty years of preparation and eight years of construction. The starting point of the new Erasmus MC is that the care provided, the facilities and the emotional support are tailored to the preferences and needs of the patient and the family. Read the full article here.

Aronsohn Constructies has provided the complete structural design, specifications and detail drawings for the new building of the Erasmus MC, as well as the structural calculations and the supervision of the execution of the structure.

Koning_willem_alexander_okt2015